CASES

NCC case in Ringsted

CONHOIST has supported NCCs employees and various subcontractors to dismantle the old roof structure and rebuild the new one with great gains in efficiency, working environment and CO2 emissions. The project was carried out in collaboration with TS Stilladsmontage, TS Platform & Hejs and Layher.

January 2025 - mid 2027

Hofor Amager for JAKON

CONHOIST has lifted the wooden structure parts, concrete blocks, facade elements and much more. Directly from street level to the installation site. CONHOIST has been used in a double configuration for extra lifting capacity. The project was carried out for JAKON in collaboration with TS Platform & Hejs and Jerslev Stilladsservice.

November 2024 - June 2025

Vanløsegård

Traverse configuration

CONHOIST has been a key player in the roof renovation carried out by Byens Tag og Facade in collaboration with Barberens Stilladser at Vanløsegård in Vanløse.

CONHOIST was used to raise rafters and distribute material from the loading towers throughout the entire construction site.

“It’s not normal to be able to assemble and mount the rafters with only one worker”

June 2023 - July 2024

Totaloverdækning med Conhoist Traverskran
Conhoist Traverskran med Stilladsoverdækning
Copenhagen Airport

Mono configuration

CONHOIST has been used in its mono configuration to move materials during renovations at Kastrup Airport.

Conhoist at Copenhagen Airport